DXZ Series Under-Carrying Mobile Formwork Bridge Erection Machine

Category:

Bridge Equipment


Rated lifting capacity:

Installed capacity:

Lifting height of beam:



Under DXZ40/1800 Technical Parameters of the Cantilever Mobile Formwork Bridge Erection Machine

Serial Number

Project

Technical Specifications and Features

1

Device Model

DXZ40/1800 Under-Carrying Self-Propelled Mobile Formwork Scaffold

2

Construction Methods Used

Cast-in-place across the entire span

3

Overall Plan

Support beneath the bridge deck: a formwork system supported by two longitudinal main girders, with self-erecting legs.

4

Applicable bridge span/girder weight

Span: 40.7 m; girder weight not exceeding 1,800 tonnes (first span: 49.7 m in length)

5

Adapt to pier height

≥5 meters

6

Adapt to longitudinal and transverse slopes

2.0%/2.0%

7

Adapt to curve radius

≥3500m

8

Wind conditions

≤ Grade 8 during relocation, ≤ Grade 10 during concrete placement, and Grade 14 in the non-operational state (anchoring).

9

Automated method

Vertical jacking is achieved using high-tonnage hydraulic cylinders. Longitudinal shifting is accomplished using a hydraulic cylinder. The lateral opening and closing of the mold frame is accomplished using hydraulic cylinders.

10

Maximum support reaction at the bracket adjacent to the front pier

2 × 800 tons

11

Maximum support reaction at the bracket adjacent to the rear pier

2 × 500 tons

12

Total power consumption of the entire machine

Approximately 80 kW

13

Power conditions

~4AC, 380V, 50Hz

14

Hydraulic system pressure

32MPa/70MPa

15

Shift speed

0–0.8 m/min

16

Main girder deflection

Less than L/550

17

Via Stability Factor

K > 1.5;

18

Transportation Conditions

Maximum single-piece weight is less than or equal to 25 t, and maximum single-piece dimension is less than

12 m × 1.92 m × 3.2 m, compliant with railway and road transport clearance limits.

19

Design and construction period

15 days/cross


Keywords:

DXZ Series Under-Carrying Mobile Formwork Bridge Erection Machine