Technical Requirements for Gantry Cranes
Gantry crane This is a gantry crane specifically designed for bridge construction. The girder launcher consists primarily of a modular main girder, support legs, and an overhead traveling crane. Its components are connected by pin joints and high-strength bolts, facilitating disassembly and transportation; compared with conventional gantry cranes, it offers convenient, rapid, economical, and practical installation. It is ideally suited for road and bridge construction companies that frequently relocate their operations.
The girder-lifting machine can be used with two cranes or with a single crane equipped with two lifting attachments to lift precast girders. When operated by two cranes simultaneously, the lifting capacity typically reaches 450 tonnes; when operated by a single crane, the lifting capacity can usually reach 900 tonnes. Equipped with outrigger travel, trolley travel, and trolley lifting mechanisms, it enables fully automated, all-directional operations. Its primary applications include lifting precast girders from the girder fabrication platform to the storage platform and, after curing, from the storage platform to the girder transport vehicle. It also facilitates the assembly and disassembly of bridge-erection machines as lifting equipment and is used in the construction of low-pier dry bridges.
Technical requirements for the beam-lifting machine:
1. Reduce the operating speed of the lifting and traveling mechanisms to enhance the alignment accuracy of precast girders and minimize impact on the structure of the girder-launching gantry.
2. The internal space of the girder launcher must be sufficiently large to accommodate the lifting of precast girders and the assembly of the bridge-erection machine.
3. Subject to meeting the strength, stiffness, and stability requirements of the main steel structure, disassembly and transportation shall be taken into consideration.
4. When two sets of precast girders are lifted simultaneously, the two lifting rigs shall operate in synchrony.
Keywords:
Gantry crane
Related blog
Address: No.1, Minghui Road,Mazhai Industrial Park, Erqi District, Zhengzhou, Henan Province
Tel: +86-371-60305013
Email: shenshangda@zzdf.cn baomin@zzdf.cn
What'sapp: 008615515866566
Facebook ID: Zhengzhou New Dafang
Copyright © Zhengzhou New Dafang Heavy Industry Science And Technology Co., Ltd.
Powered by :www.300.cn Supported IPV6 Privacy Agreement
COOKIES
Our website uses cookies and similar technologies to personalize the advertising shown to you and to help you get the best experience on our website. For more information, see our Privacy & Cookie Policy
COOKIES
Our website uses cookies and similar technologies to personalize the advertising shown to you and to help you get the best experience on our website. For more information, see our Privacy & Cookie Policy
These cookies are necessary for basic functions such as payment. Standard cookies cannot be turned off and do not store any of your information.
These cookies collect information, such as how many people are using our site or which pages are popular, to help us improve the customer experience. Turning these cookies off will mean we can't collect information to improve your experience.
These cookies enable the website to provide enhanced functionality and personalization. They may be set by us or by third-party providers whose services we have added to our pages. If you do not allow these cookies, some or all of these services may not function properly.
These cookies help us understand what you are interested in so that we can show you relevant advertising on other websites. Turning these cookies off will mean we are unable to show you any personalized advertising.